Today the site was prepared for the slab. Crusher dust was put down where the foundation is going to be poured. The level at which the slab sits has been raised. Foam pods and reo mesh has been delivered. Builder says the pour will happen on Tuesday. That gives them Monday to box in the foundation, as for some reason they like concreting first thing in the morning. Whoops, we see a few pipes that have been knocked and damaged. I hope this is fixed before they pour.
Over the weekend we saw humid weather on Friday afternoon and Saturday. The rain was holding off, even though it was forecast for both Friday and Saturday, it would have been good because the plants were becoming droopy. I had to duck off to Bunnings to buy a hose to water the plants. Then the much needed heavy rain on came on Sunday. Which affected the landscaping work on Monday. The landscaper installed pavers, finished the gravel path, planted a few trees, and prepared the ground for turf that is due to arrive tomorrow. 4 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate
Comments
Post a Comment