Saturday work and lots of progress

It looks the builder is pushing for this build to be finished by Christmas. Even the painters were here on a Saturday. Good on you boys. The stairs were also stained. The fascade finally has some colour, once the walls have been painted it will look a lot better.

We found out that internally, these jobs have been completed.

  • Robes/shelves fixed to correct design (with double rails).
  • Linen cupboards and wardrobes have sliding doors (one in master should have mirrors)
  • Shower screen are installed, and mirrors in washrooms except two because there are defects in the mirror.
  • Oven is correctly fitted.


Lets list the number of things left to do with a countdown on the number of days left to the Christmas break.

13 Days
  • External Paint still to be completed
  • Stair/handrail polish final coats
  • Door stained
  • Outdoor kitchen fix up
  • Rangehood cupboards
  • Tile skirt behind toilet
  • Landscaping
  • Fencing and Gate
  • Clothesline
  • Paint touch ups
  • Blinds installed
  • Tiler silicone
  • Carpet

Within that timeframe, we are expecting the final invoice to be submitted to the bank. The bank also takes 7 working days to process a valuer and inspection, and final payment.
































Comments

Popular posts from this blog

Day 3 of Excavation

Well, they were back there for yet another day of rock breaking labour. It now looks flat and smooth. For some reason it, doesn't look like what we pictured. We picked up that the wall that they were going to build is a lot higher that we originally though. Made a complaint, and they will be back to fix the levels. See my son in one of the pictures, he is 7 is roughly 1.2metres tall. None of the walls are supposed to be more than 1metre tall. Not only does this make it more expensive, but engagement of engineers is required to properly design a retaining wall.

Filling Footings, and downstairs tiles grouted

Today they poured the footings ready for the block work to begin. Lower level floor got grouted.

Selections...

What a hectic week. The past few weekend has been driving from supplier to supplier to work out how we want the finish of the house to look. The builder has a few preferred suppliers for things such as appliances, tapware, electricals, cabinets, bricks, carpet, tiles etc. Since the builder is an independent builder, they do not have their own studio like most project builders have. For some of the selections we must visit a store before hand and select from the range of finishings so that the supplier can quote and once we are happy with the price, they will incorporate the fittings into kitchen/bathroom cabinets. So the builder would give us an allowance on most areas of the house, it was our responsibility to visit the store and spend the allowance. Our aim was to stay as close to that allowance as we could. If the spend was under the allowance, than the builder would keep the remaining amount, if we exceed the allowance, then we would have to pay the excess. The first place we o...