Skip to main content

Power up!

Power lines have been connected, but meter not installed. The power supplier sent me an email almost two weeks ago, saying the meter would be installed within 10 working days. Only 4 days ago I got a follow up email saying they were waiting on confirmation from their contractor as to a definitive date. How disappointing and it was expected to. This power provider is very unreliable.

Looks like the place got a bit of a clean also. Floors, walls, windows, mirrors, sinks etc. It's almost sparkling new.








Comments

Popular posts from this blog

Plants

Today shrubs were planted and mulch laid. The flooring guy was here laying the underlay, tomorrow he does the carpet. No photos, cos I couldn't get in. What's Left 8 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping cont' Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet

Landscaping done

Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate

Now we have power

Today the meter was finally installed. After receiving a notice that it would be completed with 10 business days, it finally took 12 business days. Landscapers were back to scrape and level the yard ready for plants, edging, gravel and turf. Can't wait to see the finished product. Fences were installed on the front wall. Judging by the pictures, it looks like the blinds are going to be installed and carpet started soon. What's Left 10 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping cont' Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet Final invoice