I was able to get inside and witness the tilers work. Everything is pretty much grouted and finished, except the back toilet wall. I guess they need to get the toilet in before he finished off the skirting tiles for it. Also more sparkie action with a few switches, lights and A/C and intercom controllers fitted. Too bad power isn't connected for testing.
Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate