Today the front wall was core-filled. Also the tiler has come back from an absence to make some progress on the tiling, finally got up to the ceiling height. I guess next will be the finish off grouting. Some happy snap...














Comments

Popular posts from this blog

Saturday work and lots of progress

It looks the builder is pushing for this build to be finished by Christmas. Even the painters were here on a Saturday. Good on you boys. The stairs were also stained. The fascade finally has some colour, once the walls have been painted it will look a lot better. We found out that internally, these jobs have been completed. Robes/shelves fixed to correct design (with double rails). Linen cupboards and wardrobes have sliding doors (one in master should have mirrors) Shower screen are installed, and mirrors in washrooms except two because there are defects in the mirror. Oven is correctly fitted. Lets list the number of things left to do with a countdown on the number of days left to the Christmas break. 13 Days External Paint still to be completed Stair/handrail polish final coats Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet W

More plants/trees and pavers

Over the weekend we saw humid weather on Friday afternoon and Saturday. The rain was holding off, even though it was forecast for both Friday and Saturday, it would have been good because the plants were becoming droopy. I had to duck off to Bunnings to buy a hose to water the plants. Then the much needed heavy rain on came on Sunday. Which affected the landscaping work on Monday. The landscaper installed pavers, finished the gravel path, planted a few trees, and prepared the ground for turf that is due to arrive tomorrow. 4 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate

Landscaping done

Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate