Paint progress

Hasn't been much update recently, as painters and plasterers have been backwards and forwards having each others fix and inspect so that they are happy with the quality of finish before the painter puts the finishing colour on the top. Nothing worse than having imperfections underneath which show through once paint has been applied, the even colour makes it easier for faults to standout.

Today I discovered the ceiling has been painted. External painting has completed on the top level, so they have moved into the internal part of the house. Looks like they have sprayed. Not sure how many coats, but I'm sure I agreed to a 3 coat system, ie. undercoat and two top coats.















Comments

Popular posts from this blog

More plants/trees and pavers

Over the weekend we saw humid weather on Friday afternoon and Saturday. The rain was holding off, even though it was forecast for both Friday and Saturday, it would have been good because the plants were becoming droopy. I had to duck off to Bunnings to buy a hose to water the plants. Then the much needed heavy rain on came on Sunday. Which affected the landscaping work on Monday. The landscaper installed pavers, finished the gravel path, planted a few trees, and prepared the ground for turf that is due to arrive tomorrow. 4 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate

Latest Delivery

With all the action in the last few days, today we received a delivery today, first bit of colour to the house

Landscaping done

Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate