Today the site was prepared for the slab. Crusher dust was put down where the foundation is going to be poured. The level at which the slab sits has been raised. Foam pods and reo mesh has been delivered. Builder says the pour will happen on Tuesday. That gives them Monday to box in the foundation, as for some reason they like concreting first thing in the morning. Whoops, we see a few pipes that have been knocked and damaged. I hope this is fixed before they pour.
Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate