Skip to main content

Slab Prep

Today the site was prepared for the slab. Crusher dust was put down where the foundation is going to be poured. The level at which the slab sits has been raised. Foam pods and reo mesh has been delivered. Builder says the pour will happen on Tuesday. That gives them Monday to box in the foundation, as for some reason they like concreting first thing in the morning. Whoops, we see a few pipes that have been knocked and damaged. I hope this is fixed before they pour.




Comments

Popular posts from this blog

Plants

Today shrubs were planted and mulch laid. The flooring guy was here laying the underlay, tomorrow he does the carpet. No photos, cos I couldn't get in. What's Left 8 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping cont' Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet

Landscaping done

Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate

Now we have power

Today the meter was finally installed. After receiving a notice that it would be completed with 10 business days, it finally took 12 business days. Landscapers were back to scrape and level the yard ready for plants, edging, gravel and turf. Can't wait to see the finished product. Fences were installed on the front wall. Judging by the pictures, it looks like the blinds are going to be installed and carpet started soon. What's Left 10 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping cont' Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet Final invoice