It's been a busy week or so. Construction has been battling bad weather and rock. Rock has been hampering excavation because the heavy machinery needs to break it all up. I have been told by the builder it's the worse type of rock they've seen. That sounds reassuring. Maybe they are trying to justify the delays. Well, after several day on site, and several of nothing happening, the wall is almost complete. All the extra excavation has caused a big mound to pile on the block. Who knows what will happening with this. I assume it will be backfilled, but how much of it.
Well, they were back there for yet another day of rock breaking labour. It now looks flat and smooth. For some reason it, doesn't look like what we pictured. We picked up that the wall that they were going to build is a lot higher that we originally though. Made a complaint, and they will be back to fix the levels. See my son in one of the pictures, he is 7 is roughly 1.2metres tall. None of the walls are supposed to be more than 1metre tall. Not only does this make it more expensive, but engagement of engineers is required to properly design a retaining wall.
Comments
Post a Comment