It's been a busy week or so. Construction has been battling bad weather and rock. Rock has been hampering excavation because the heavy machinery needs to break it all up. I have been told by the builder it's the worse type of rock they've seen. That sounds reassuring. Maybe they are trying to justify the delays. Well, after several day on site, and several of nothing happening, the wall is almost complete. All the extra excavation has caused a big mound to pile on the block. Who knows what will happening with this. I assume it will be backfilled, but how much of it.
Today shrubs were planted and mulch laid. The flooring guy was here laying the underlay, tomorrow he does the carpet. No photos, cos I couldn't get in. What's Left 8 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping cont' Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet