Since I said some words of disappointment to my builder last week, I didn't expect much would happen on site. After all no approval have been given by council. We requested start dates, and a tentative completion date. But after a week and a half, still no dates. Several people who are looking over the build have been away, and I expect the delays to get worse. There has been repeated correspondence about agreeing to plans and selections, but the builder can't get the details right. I don't blame them since it has been several months from the time we had the selection meetings. We keep a good record of all our dealings. Probably better than them. Lots of request for changes and clarification on this and that. It doesn't happen fast, it seems to take days to get an answer or response back. But things seem to be looking better. We have a temporary power pole. I'm sure they are going to need this to have power tools working when construction happens. Next is to have water connected, since they've been using the neighbours taps to wash down.
Well, they were back there for yet another day of rock breaking labour. It now looks flat and smooth. For some reason it, doesn't look like what we pictured. We picked up that the wall that they were going to build is a lot higher that we originally though. Made a complaint, and they will be back to fix the levels. See my son in one of the pictures, he is 7 is roughly 1.2metres tall. None of the walls are supposed to be more than 1metre tall. Not only does this make it more expensive, but engagement of engineers is required to properly design a retaining wall.
Comments
Post a Comment