We have the power... well, almost

Since I said some words of disappointment to my builder last week, I didn't expect much would happen on site. After all no approval have been given by council. We requested start dates, and a tentative completion date. But after a week and a half, still no dates. Several people who are looking over the build have been away, and I expect the delays to get worse. There has been repeated correspondence about agreeing to plans and selections, but the builder can't get the details right. I don't blame them since it has been several months from the time we had the selection meetings. We keep a good record of all our dealings. Probably better than them. Lots of request for changes and clarification on this and that. It doesn't happen fast, it seems to take days to get an answer or response back. But things seem to be looking better. We have a temporary power pole. I'm sure they are going to need this to have power tools working when construction happens. Next is to have water connected, since they've been using the neighbours taps to wash down.


Comments

Popular posts from this blog

Saturday work and lots of progress

It looks the builder is pushing for this build to be finished by Christmas. Even the painters were here on a Saturday. Good on you boys. The stairs were also stained. The fascade finally has some colour, once the walls have been painted it will look a lot better. We found out that internally, these jobs have been completed. Robes/shelves fixed to correct design (with double rails). Linen cupboards and wardrobes have sliding doors (one in master should have mirrors) Shower screen are installed, and mirrors in washrooms except two because there are defects in the mirror. Oven is correctly fitted. Lets list the number of things left to do with a countdown on the number of days left to the Christmas break. 13 Days External Paint still to be completed Stair/handrail polish final coats Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet W...

More plants/trees and pavers

Over the weekend we saw humid weather on Friday afternoon and Saturday. The rain was holding off, even though it was forecast for both Friday and Saturday, it would have been good because the plants were becoming droopy. I had to duck off to Bunnings to buy a hose to water the plants. Then the much needed heavy rain on came on Sunday. Which affected the landscaping work on Monday. The landscaper installed pavers, finished the gravel path, planted a few trees, and prepared the ground for turf that is due to arrive tomorrow. 4 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Outdoor kitchen fix up Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate

Landscaping done

Today the ground was wet, but the landscapers got the job done before lunch time. I also noticed the house had a big tidy up and looks nice and shiny. The countdown is on, and the handover inspection has been booked. 3 Days Paint to front of wall Stair/handrail polish final coats?? Door stained Reconnect BBQ and side burner Rangehood cupboards Landscaping cont' (lay turf) Driveway gate