Since I said some words of disappointment to my builder last week, I didn't expect much would happen on site. After all no approval have been given by council. We requested start dates, and a tentative completion date. But after a week and a half, still no dates. Several people who are looking over the build have been away, and I expect the delays to get worse. There has been repeated correspondence about agreeing to plans and selections, but the builder can't get the details right. I don't blame them since it has been several months from the time we had the selection meetings. We keep a good record of all our dealings. Probably better than them. Lots of request for changes and clarification on this and that. It doesn't happen fast, it seems to take days to get an answer or response back. But things seem to be looking better. We have a temporary power pole. I'm sure they are going to need this to have power tools working when construction happens. Next is to have water connected, since they've been using the neighbours taps to wash down.


Comments

Popular posts from this blog

Day 3 of Excavation

Well, they were back there for yet another day of rock breaking labour. It now looks flat and smooth. For some reason it, doesn't look like what we pictured. We picked up that the wall that they were going to build is a lot higher that we originally though. Made a complaint, and they will be back to fix the levels. See my son in one of the pictures, he is 7 is roughly 1.2metres tall. None of the walls are supposed to be more than 1metre tall. Not only does this make it more expensive, but engagement of engineers is required to properly design a retaining wall.

Filling Footings, and downstairs tiles grouted

Today they poured the footings ready for the block work to begin. Lower level floor got grouted.

Selections...

What a hectic week. The past few weekend has been driving from supplier to supplier to work out how we want the finish of the house to look. The builder has a few preferred suppliers for things such as appliances, tapware, electricals, cabinets, bricks, carpet, tiles etc. Since the builder is an independent builder, they do not have their own studio like most project builders have. For some of the selections we must visit a store before hand and select from the range of finishings so that the supplier can quote and once we are happy with the price, they will incorporate the fittings into kitchen/bathroom cabinets. So the builder would give us an allowance on most areas of the house, it was our responsibility to visit the store and spend the allowance. Our aim was to stay as close to that allowance as we could. If the spend was under the allowance, than the builder would keep the remaining amount, if we exceed the allowance, then we would have to pay the excess. The first place we o...