It looks the builder is pushing for this build to be finished by Christmas. Even the painters were here on a Saturday. Good on you boys. The stairs were also stained. The fascade finally has some colour, once the walls have been painted it will look a lot better. We found out that internally, these jobs have been completed. Robes/shelves fixed to correct design (with double rails). Linen cupboards and wardrobes have sliding doors (one in master should have mirrors) Shower screen are installed, and mirrors in washrooms except two because there are defects in the mirror. Oven is correctly fitted. Lets list the number of things left to do with a countdown on the number of days left to the Christmas break. 13 Days External Paint still to be completed Stair/handrail polish final coats Door stained Outdoor kitchen fix up Rangehood cupboards Tile skirt behind toilet Landscaping Fencing and Gate Clothesline Paint touch ups Blinds installed Tiler silicone Carpet W...
Comments
Post a Comment